Order hardware runs by sim risk, gate each stage on the last, and put the fragile cell last with a spotter
risk-ordered-real-deployment.Script hardware sessions as a risk ladder: baseline first, sim-riskiest last with a spotter, suspended smoke before ground, each stage gated on the previous, environment (floor mu) recorded as a selection input - and stop at the stage that misbehaves.
Symptom
Five policy-x-gain combinations had to go on hardware in one session, with sim survival ranging from 20/20 down to 17/20 (and zero-command survival down to 2/20) - an unordered session risks breaking the robot on an avoidable run.
Context
The execution sheet fixed the order as sim-risk low to high, control baseline first (current SOTA establishes the floor reference), the fragile cell (fric-2400@kd1.0) last with a person spotting throughout. Stage gating: suspended smoke (feet off ground, 10 s each, all five pass before anything touches down) -> suspended with IMU and forward command (gait forms in the air) -> grounded runs -> speed raise only for combos that survived the previous stage -> zero-command tests only with a spotter, ordered by sim zero-cmd survival, with the 2/20 cell skipped by default. Preconditions include recording the floor material and estimating mu (if mu <~0.6, sim says pick the kd1.2 gain as main), port/CAN self-check, calibration frozen. Any stage failing stops the session at that stage: "任一段出问题就停在那一段, 不要跳到下一段".
Change
Session structured as a risk ladder with per-stage gates instead of a flat checklist; per-combo sim survival numbers written into the run table as the ordering key.
Outcome
The session design localized any failure to the cheapest stage that could reveal it, kept the robot safe for the informative fragile run, and made the control baseline available before any comparison run.
Mechanism
Hardware sessions consume a shared budget (robot integrity, battery, floor time); ordering by predicted risk means information is bought cheapest-first, and stage gates convert an expensive failure into a cheap earlier one. Baselines run first because every later reading is relative to them.
Applies when
- taking multiple policies/configs to hardware in one session
- a candidate is known-fragile in sim but must be measured
- writing a deployment runbook for a new robot
“跑序 = sim 风险从低到高, 最险的放最后 (依据 = 存活门/零指令存活) … ⑤ 是 sim 里最脆的一格 … 放最后跑, 全程留人扶, 起步即给 cmd, 零指令不做。… 任一段出问题就停在那一段, 不要跳到下一段。”